Sunday, 6 September 2015

Week 18 (week beginning 1st September)

Slightly premature arrival of the rainwater harvesting tank.
This will eventually be located under the hobbies room 'driveway'.

Completion of the Caselle Garage/Hobbies Room SIPs build.
Farewell and huge thanks to Phil, Ben and Minty who have worked very long days
to compensate for delays, in all weather conditions.
Thank you also to all the neighbours for the disruptions - they should be down to a minimum from now on.

Completion of the covering of the waterproof membrane.

David making some minor amendments to the window in the garage
(with the hobbies room across the garden in the background).

Sunday, 30 August 2015


The Video

Here is the timelapse video (3 photographs were taken every 10 minutes).
Before you panic - it only lasts 1 minute 11 seconds before repeating itself. (we are working on refining it).

Sorry it is a bit grainy but we (that is the royal 'we'  of course, as anyone who knows the level of Vicki's IT skills will appreciate) had to make it lower quality so that it was small enough to publish.



Thursday, 27 August 2015





Week 17: Thursday 27th August
 
Old LIttletonians, Barbara and David Elsmore, just happen to live in the house which backs onto Caselle and have sent us this photograph.

The windows you can see are  bedrooms 3 & 4 and also the rooflights to the dining area.














Wednesday, 26 August 2015

Week 17:  Wednesday 26th August

After a very wet week (Monday evening was spent mostly holding a hair dryer over 3 pairs of builders' boots to prevent them from getting Foot Rot), we are now almost water tight.


Tuesday morning (25th August)
Roof over our bedroom with roof light and dormer window at the front.
The interior of our bedroom.


  Tuesday was spent preparing the rest of the roof panels for Wednesday.


The crane is quite big for a little cul-de-sac!

Vicki went into Sainsbury's to buy a bunch of flowers and bottle of wine for each of the neighbours who have been so accommodating when they have been blocked in.  When she explained to the lady at the checkout that we were having some building work done and this was a 'thank you' to the neighbours, the checkout lady asked if we were 'the crane'.  It seems that it is visible across the town.

Wednesday was very busy with the completion of the roof on both the house and the double garage.





The final delivery - the garage for Caselle and David's workshop has arrived.

Sunday, 23 August 2015

Week 16:  Saturday 22nd August

Quite a frustrating week as weather and cranes (which were too heavy for the soft ground) hampered progress.  However, extra steel plates have now been delivered for the crane to sit on so we should be back in business on Monday.
Steel plate being delivered, on which the crane can now sit without sinking.

Isn't it every little boy's dream to play in one of these?

A fine staircase, built of course by David; infinitely easier than going up and down a
ladder for the next six months.

Thursday, 13 August 2015

Week 15:  Thursday 13th August

Despite horrendous weather forecasts it stayed dry in Sherborne so progress has been very good.  David has spent most of the day tidying up the site and making several trips to the local tip.  Vicki went shopping.



This part of the house has a different roof from the main house.
Our bedroom will have a vaulted ceiling as the vertical walls are not full height.
The en-suite is in the far corner of our bedroom.

Wednesday, 12 August 2015

Week 15:  Monday 10th August

Moving day - we rented a transit from Williams' in Otterbourne.  We are renting Caselle (the bungalow next door to the plot) and this is unfurnished; we had so much stuff that in the end we had to make two trips (sleeping in Sherborne on Monday night and David making an early start on Tuesday to get the van back to the garage for 08:00).  Vicki drove the van on one of the legs
Back to Slimming World for Vicki asap!
and we have now decided that we would like a camper van - you can see so much more of the surrounding countryside when you are in a higher seat.

Meanwhile, more progress made by Timber Homes Ltd:

  • Engineered joists will make it very easy to feed the services through.
  • In the background - the floor in our bedroom.




Week 15:  Tuesday 11th August

A fairly challenging day - progress was not as expected but Phil, Ben and Minty worked until 19:30 ( a 12 hour day) to try to catch up with where they were expecting to be.

After consultations with Glosford, David was unhappy with the position of the upright steel at the rear corner of the dining area and did a bit of redesigning.  On Monday, we took this to BDM in Basingstoke, a company David has done much business with over the years through Dega and who are making the steel lintels for the house.  His contact there, Trevor, very obligingly leapt to our rescue and organised the re-welding o the plate at the bottom of the steel - we are extremely grateful to everyone at BDM for doing this for us with no notice.


Week 15:  Wednesday 12th August

Vertical post for the main garage going into position


Steel beam for over the main garage door going into position





By the end of Wednesday, we had the makings of a first floor.