Week 3
With holidays for both Phil (Reeves) and ourselves in separate weeks over the past fortnight, this is the first update for a while.
- Block work for the Caselle garage/workshop has been laid up to to damp proof course (DPC) level.
- All footings for main house have been dug, inspected by Building Control and NHBC inspector.
- Concrete has now been laid in all trenches.
- Site has been set out in preparation for remaining block work.