Tuesday 12 January 2016

Ensuite 1 and Wall

More things are beginning to be finished off:

Still awaiting window cill (in the same material as the vanity unit top), one row of splashback tiles above the vanity unit (to match those along the middle row of the shower), towel rail, glass shower side and mirror - but it is all coming together.




And here is the wall beside the Caselle driveway (the sides of the wall will be rendered to match the garage wall eventually) and the path leading from the side door of the Caselle garage down into the back garden.





No comments:

Post a Comment