Progress all around

Bedrooms 2 & 3 are now plastered - thank you so much to Tony Buckingham, Justin and Jake who worked like Trojans.  A beautiful smooth finish - and this time I promise to listen to Tony and that the first coat of paint will be a mist coat (when doing the bathrooms I believed the salesman who persuaded me to buy a very expensive paint on the promise that a mist coat wouldn't be needed - but it has peeled in some areas).



Marc is levelling out around the front of the house, preparing the ground for a stone path immediately next to the house with a small border of plants next to the road.  A very stressful job as there are cables only 15 cm down.  The trenches you can see here are for the footings for a stone retaining wall on the road side of the path.






Terry and Ashley have been joined by Danny and are continuing with rendering - here we have the Caselle garage and David's workshop all scratched and finished.









Last but not least we have been preparing the garage for screeding at 07:00 tomorrow.  This involved scraping the garage floor to remove all concrete lumps, endless sweeping, two layers of a thick polythene damp proof membrane, sheets of super strength Kingspan Styrozone - insulation which can take the load of a car; this is rabbited at the edges so it all slots together beautifully.  Finally there will be one more layer of waterproof membrane on top before the screed is poured over.







No comments:

Post a Comment